Multi-mole method
Sewer main and connection pipe work with limitless functionality! Vertical and horizontal connections are extremely easy and speedy.
The "Multi-Mole Method" is a technique developed by Sato Iron Works that mechanizes horizontal pushing and vertical excavation using "TonTon-kun" and "BuruBuru-kun." In addition to standalone use, it also allows for the joining of horizontal and vertical sections. This method significantly improves labor efficiency, safety, and construction quality. Please feel free to contact us if you have any inquiries. 【TonTon-kun Features】 ■ More cost-effective than conventional pushing methods ■ Capable of construction at one location per day ■ Strong against gravel-mixed ground due to impact pushing ■ Can be pushed from an open-cut trench (effective width of 900mm) *For more details, please download the PDF or feel free to contact us.
- Company:マルチモール協会
- Price:Other